Sending work to production
The gate checks, the dispatch, and what your factory or workroom actually receives.
On this page
When a commission is designed, measured and paid to your policy, it goes to production. Faden makes the handoff a step, not a scramble.
The gate
Before dispatch, Faden checks the commission is actually ready:
- Mandatory measurements are present (set which in Settings → Production & fit).
- The design is complete: cloth, options and construction all chosen.
A commission missing pieces is held with the gap named, rather than reaching a cutter as a guess.
The dispatch
Dispatch generates the tech pack (the cut sheet with measurements, options, cloth and maker notes) and moves the card into production on the Board. See Tech packs.
Who receives it
- In-house workroom: the job appears in the queue.
- Outside factory or maker: send the tech pack, or give the factory the Workroom portal (Pro) and they work a live ticket queue instead of PDFs. See The Makers & the Workroom.
Client identity can be masked on factory-bound paperwork. The maker sees measurements and instructions, not your client list. The switch is Factory data masking in Settings → Security & data, on the Data control tab.
Thanks. That helps us keep it right.